Overclockers Australia!
Make us your homepage. Add us to your bookmarks  
Major Sponsors:
News
Current
News Archive

Site
Articles & Reviews
Forums
Wiki
Image Hosting
Search
Contact

Misc
OCAU Sponsors
OCAU IRC
Online Vendors
Motorcycle Club

Hosted by Micron21!
Advertisement:

OCAU News
Steel vs Concrete (44 Comments) (link)
 Wednesday, 28-June-2006  00:47:58 (GMT +10) - by Agg

JohnC sent over these interesting pics that come with a story:

Engineering Quiz:

A 20 ton Hyundai Digger is on top of a flatbed trailer and heading east on Interstate 70 near Hays, Kansas. The extended shovel arm is made of high tensile steel and the approaching overpass is made of commercial-grade concrete, reinforced with 1 1/2 inch steel rebar spaced at 6 inch intervals in a crisscross pattern layered at 1 foot vertical spacing.

Solve: When the shovel arm hits the overpass, how fast do you have to be going to slice the bridge in half? (Assume no effect for headwind and no braking by the driver...)

Extra Credit: Solve for the time and distance required for the entire rig to come to a complete stop after hitting the overpass at the speed calculated above.


   
Click to enlarge!



Return to OCAU's News Page

Advertisement:

All original content copyright James Rolfe. All rights reserved. No reproduction allowed without written permission.